Office Building Oskar
Munich
- Architects
- Arnold / Werner
- Location
- Oskar-von-Miller-Ring 20, 80333 Munich
- Year
- 2018
- Client
- Hines
- Team
- Arnold / Werner Architekten
- Signaletics and Light Installation
- Fantomas
In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.
Related Projects
Magazine
-
Lowtech im Regenwald
2 days ago
-
Soldan Forum in Frankenberg
2 days ago
-
Lokschuppenareal Neubrandenburg
2 days ago
-
Kérés KITA für den TUM-Campus
3 days ago