Extension of an Industrial Site

Düren
Architects
avantrace architecture scenographie
Year
2005

The project for offices lies within an industrial complex in the Ruhr valley. We proposed a building which embeds itself in a cautious manner within its immediate surroundings by revaluing the latter.

The implementation of alternating halfstoreys facilitates communication within the different teams. The generous glazing on two sides of the building displays a sun protection system with tightened textiles. The consumption of energy is optimized through a well isolated building envelope and the translucent textiles absorbing the intrusion of direct sunlight.

CLIENT
Hoesch GmbH & CO KG

ASSIGNMENT
Concept, planning and execution

ARCHITECTURE
el hassani & keller and
Jeanne Hoesch, associated architects,
Konstruktionsgruppe Statik (engineers)

PROGRAM
Offices and social rooms

SURFACE
600 m² net

TIMELINE
Completion March 2005

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by avantrace architektur szenografie

Dwelling in the mountains
Lenzerheide, Switzerland
Exhibition «Build me a High School»
Paris, France
Person guidance system within the Hall of Mirrors in the Palace of Versailles
Chateau de Versailles, France
Zoological Garden
Paris, Bois de Vincennes, France
Carl F. Bucherer Shops
Worldwide