blocher partners office building

 Back to Projects list
Location
Herdweg 19 , 70174 Stuttgart
Year
2012
Client
blocher partners
Brief
New construction of an office building according to DGNB Platinum certification
Gross floor area
3,300 sqm

Much is demanded of today’s office buildings, especially if they are to house many disciplines under one roof, as is the case here: In addition to the office for architecture and interior design, this building houses a firm that develops mono-brand concepts as well as an agency for communications, corporate design and visual merchandising. As the setting for their jewel, the architects used the rather heterogeneous urban backdrop of Herdweg: Simple, but striking. An eye-catcher that bedazzles all who walk or drive past.

The rustic charm of exposed concrete – a double-layered concrete façade with cavity insulation – plays off against the ethereal transparency of broad windows. Elements of Sipo mahogany, strategically placed, give the façade depth; and the clean lines add a sense of order and dynamics.

The office building consists of three full floors, a garden, a roof and cellar. The simplicity of the interior design, with its sandblasted and exposed concrete surfaces as well as its cement screed flooring, works in harmony with the outer appearance. Open floors, which nevertheless have clearly defined spaces, make the boundaries between working areas disappear.

A furnished patio adjoins the generous cafeteria on the garden level, flanked on one side by the single-story wing of the building, which houses the communications agency typenraum. The other side opens out onto a two-story atrium, separated from the cafeteria only by a sliding glass wall. From the ground floor, the atrium opens into an impressive open space graced by a light-installation inspired by the “jackstraws” or “pick-up-sticks” game. There are also manifold visual perspectives to be enjoyed from the open-designed steel staircase, which leads from the garden level to the uppermost floor.

Certified with Gold by the DGNB (German Sustainable Building Council), the building incorporates a broad range of sustainability measures. Amongst them are the prevention of toxic materials or the reduction of the life circle costs. With a view ahead, it was also important to create dividable floors to be able to implement several offices or apartments in the future. The intermingling of ecology and economy also shows within the fusion of building construction and technology which includes a thermally comfortable room climate as much as energy saving at the maximum. The lighting concept which relies on daylight and LED technology belongs as much to the measures as do aesthetical aspects.

Other Projects by blocher partners

Breuninger Premium Designer Floor Stuttgart
Holiday home Lake Constance
Lake Constance
Area at Wiener Platz Feuerbach
Stuttgart-Feuerbach
Office and residential building P3
Mannheim
Hebel School Hemsbach
Hemsbach